29
TOROS TERMINAL
Since 1984, when port services
began, how many ships have docked
at Ceyhan and Samsun Terminals?
10,897
How many tons have
been handled at
Toros Terminals?
million tons
133
22
Cheops pyramids
365
Empire State Buildings
700
thousand Boeing 777
passenger planes
TEKFENMANUFACTURING
What can be placed inside the
biggest field tank manufactured
so far?
Ø
100m
7 tanks with a diameter of
100 meters were built at the
BTC Ceyhan Terminal. Each
of these tanks can hold a
soccer field.
What is the diameter of the
biggest spherical LPG tank built
so far?
23.7m
265,000 LPG cylinders used
in households can be filled
with the LPG stored in the
7000-cubic meter spherical
tank built for Morocco.
What is the length of the longest
process column built so far?
75m
The process column built
for the Tüpraş İzmit Refinery
is 75 m high, has a diameter
of 7.5 m, and weighs 240
tons. This height exceeds
that of the historical Galata
Tower in İstanbul built by
the Genoese in 14th century
Constantinople.