60 YEARS IN

TEKFENCONSTRUCTION

What is the total length of pipelines

built by Tekfen?

7,500

km

Put end to end, these pipes would reach from

İstanbul to Beijing, Johannesburg, or Boston.

What is the highest number of

personnel working simultaneously

in a project?

10,000

A total of 8,005 personnel work at the Shah Deniz

Stage 2 Sangachal Land Terminal project, which still

continues. More than 10,000 worked simultaneously

on the TAG Highway.

What is the greatest number

of time zones where work was

conducted?

10

How much steel has so far been

produced at Ceyhan Steel?

255,000

tons

What are the highest and lowest

temperatures in which work has

been conducted?

+58°C/ -56°C

How much does the heaviest

platform built to this day weigh?

18,500

tons

How long is the sum of highways in

single lane built to this day? How far

could one go on a road that long?

4,540

km

One could drive from

İstanbul to Paris and back.