Background Image
Previous Page  3 / 8 Next Page
Information
Show Menu
Previous Page 3 / 8 Next Page
Page Background

3

At the 23rd World Energy Congress,

held this year in İstanbul, Tekfen Construc-

tion and Saudi Aramco, the Saudi petroleum

company, have signed a memorandum of

understanding marking the intent of both

parties to develop potential opportunities.

Signed on October 11, 2016, the memoran-

dum makes Tekfen Construction eligible to

bid for the engineering, procurement, and

construction works of Saudi Aramco’s fu-

ture projects.

The cooperation between Tekfen and

Saudi Aramco goes back to the early 1990s.

To date, Tekfen Construction has completed

various projects such as the Hawiyah Natu-

ral Gas Pipeline, the Cuaima-Berri Ethane

Gas Pipeline, the Harad Gas and Condensate

Pipelines, Quad-1 Pipeline, and the Yanbu

Refinery, successfully meeting the expecta-

tions of Saudi Aramco, which is known for

its extremely high standards regarding qual-

ity and safety.

New Opportunities with Saudi Aramco

Saudi Aramco, the largest energy company in the world, has signed a memorandum of under-

standing with Tekfen Construction to invite the company to the tenders it will hold in the future.

On with the records

Since its establishment in 1956, Tekfen Construction has com-

pleted numerous ambitious projects in pipeline engineering, and has

recently broken a world record at TANAP (Trans Anatolian Natural

Gas Pipeline) project. Tekfen, having already completed over 6000

kilometers of pipelines in many parts of the world, has successfully

joined a 2000-meter pipeline in 14 hours, setting a new world record.

Tekfen Construction has undertaken the construction of Lot 3

in the TANAP project, the 1850-km pipeline that aims to meet the

natural gas demand of Europe and Turkey, and has successfully com-

pleted a total of 145 welds with 5 welding stations and 16 welders in

one work day. This marks the greatest length of a 56”-pipeline joined

at one go with flawless welding. In addition, a 5-km section of the

welded pipeline was lowered in one piece, thus successfully complet-

ing a 10-km pipe-laying in a single day.

Tekfen Construction has also carried out the longest horizontal

drill in Europe within the scope of TANAP. With a riverbed width nearly

1100 meters, the Sakarya River posed one of the toughest phases of the

project, and was traversed underground using horizontal directional

drilling technique. In terms of pipe diameter (56”) and length (1100

m), this work constitutes the longest horizontal drill in Europe.

Tekfen Construction continues to break records at the TANAP project, crowning its expertise in pipeline engineering. Tekfen set the world record in the

number of automated welds completed in a day, while also carrying out the longest horizontal drill in Europe for the Sakarya River pass.